The waste waters produced during the flue-gas desulfurisation process have to be treated before being discharged. The main requirements are:
- Gypsum desaturation
- Reduction of solids
- Removal of heavy metals
Berkefeld
VWS Deutschland GmbH
Lueckenweg 5
29227 Celle
Germany
Telefon: +49 (0)5141/803-0
Telefax: +49 (0)5141/803-100
Berkefeld
VWS Deutschland GmbH
Baumeisterallee 13-15
04442 Zwenkau
Germany
Telefon: +49 (0)34203/39-0
Telefax: +49 (0)34203/39-100
Treatment of waste water from the flue-gas desulfurization process
The waste waters produced during the flue-gas desulfurisation process have to be treated before being discharged. The main requirements are:
System for the treatment of FGD wastewater
The treatment procedures for flocculation, precipitation and sedimentation will be designed as two-staged processes. If requested by our clients a continuous sand filtration will be added.
Depending on the location of the water treatment plant and the discharge requirements to be fulfilled there further treatment steps can be necessary: