FGD Waste Water Treatment

Treatment of waste water from the flue-gas desulfurization process

Contifilt - sand filtration from Berkefeld

The waste waters produced during the flue-gas desulfurisation process have to be treated before being discharged. The main requirements are:

  • Gypsum desaturation
  • Reduction of solids
  • Removal of heavy metals
System for the treatment of FGD waste water from flue-gas desulfurisation

System for the treatment of FGD wastewater

The treatment procedures for flocculation, precipitation and sedimentation will be designed as two-staged processes. If requested by our clients a continuous sand filtration will be added.

Depending on the location of the water treatment plant and the discharge requirements to be fulfilled there further treatment steps can be necessary:

  • Further reduction of solids (filtration)
  • Further reduction of specific substances (nitrate)
  • Evaporation (ZLD = Zero Liquid Discharge processes) for reliable compliance with water drain regulations